They are making more progress on framing. The weather is lovely and the trusses are being assembled. Did I mention how unbelievably huge they are? The footprint of the house is approximately 60×60 feet. This means the trusses are nearly 60 feet long.
Laying out on the ground.
And a partly assembled one. There are 2 like this that are the ends of the house.
I call these the music notes. They are part of the main outside truss.
You can see the progression of them being assembled. They are delicate at this stage until the plywood is attached spanning multiple ones.
The top part (right on the image above) of the note represents a decorative overhang at the top of the roof. And from a different angle.
They added some missing sub-floor. Now we can walk from the garage into the house.
Also, stairs!
Its starting to feel like a house. Now, a video walk around of the truss.
Hogan Haake